The existing wall has fallen into disrepair and required careful dismantling, making sure debris was not being deposited in the water course.
Once the original wall was completely removed, the next challenge was to construct a cofferdam to allow us to work down to below the water level and construct the new reinforced concrete foundations.
This cofferdam was then used as access along the front of the wall to begin the construction of the new wall, which composed of a double skinned brick wall with a reinforced concrete infill for extra structural integrity. Scaffolding was then required for access as the wall was being completed.
Ovenden Allworks is a member of Constructionline and are Acclaim Health and Safety certified. We are members of the Civil Engineering Contractors Association. We are a Section 278 approved contractor for Kent County Council. We also have ISO 14001(Environmental certification), ISO 9001 (Quality Assurance).