The existing drives and paths were in poor conditions due to their age and nearby roots damaging the surfacing.
The works consisted of removal of the intrusive roots, installing new edgings and edge planed the existing tarmac in preparation of a new 40mm tarmac overlay.
In other areas badly affected areas we planned out the defective surfacing, supplied laid and compacted new subbase granular material and laid new tarmac.
Access to the works was tight, plus the works were undertaken in a sensitive area, however, the works were completed with minimal disruption over three days.
Ovenden Allworks is a member of Constructionline and are Acclaim Health and Safety certified. We are members of the Civil Engineering Contractors Association. We are a Section 278 approved contractor for Kent County Council. We also have ISO 14001(Environmental certification), ISO 9001 (Quality Assurance).