Ovenden Allworks recently completed surfacing works at the Margate and Ramsgate Cemeteries.

The existing drives and paths were in poor conditions due to their age and nearby roots damaging the surfacing.

The works consisted of removal of the intrusive roots, installing new edgings and edge planed the existing tarmac in preparation of a new 40mm tarmac overlay.

The Project

The Project

In other areas badly affected areas we planned out the defective surfacing, supplied laid and compacted new subbase granular material and laid new tarmac.

Access to the works was tight, plus the works were undertaken in a sensitive area, however, the works were completed with minimal disruption over three days.