The track hosts a leg of the World Rallycross Championship and is subject to serious racing and the wear that comes with it.
The rally element of the track was constructed of tarmac plainings bound with cement to provide a structurally solid material, that maintains a loose surface to provide the track with its transition between bound tarmac section and challenging driving experience.
These works were completed using Ovenden's in-house plant, including excavators, roller, bob cat with grader attachment and Ovenden concrete's volumetric mixer.
Ovenden Allworks also built the rallycross modifications on the Top Gear track.
Ovenden Allworks is a member of Constructionline and are Acclaim Health and Safety certified. We are members of the Civil Engineering Contractors Association. We are a Section 278 approved contractor for Kent County Council. We also have ISO 14001(Environmental certification), ISO 9001 (Quality Assurance).