Ovenden Allworks continues to provide their services to the local education sector.

The surfacing division was chosen to carry out resurfacing works to two play areas at the Astor College. These works included planing out to the edges and relining of the various ball courts.

Also included in the works was an access road that also required planing out and the relaying of binding material for large patch repairs and resurfacing of the entire area.

Due to the nature of the environment where the works took place, the works carried out had to be completed in a strict time frame before the areas were in use again.