We cleared the site using our own LANTRA chainsaw trained operatives to allow us access to the steep hill to allow us to prepare the ground surface with an excavator.
After overcoming the difficult access and ensuring the site was secure, the sub base was constructed with granular Type 1 material after the ground had been cut to the correct levels. The steel reinforced concrete was laid in stages up the bank. The walkway has accompanying up stands and down stands for structural integrity and to support the hand rails.
The walkway was finished with a non-slip Dura Walk two coat system and fitted with a corduroy hazard warning strips at the tops and bottoms of each set of steps for the visually impaired.
The works were carried out to a very tight programme, but all parties worked together closely to ensure that the works were completed by the deadline of the university reopening for the Autumn Term.
Ovenden Allworks is a member of Constructionline and are Acclaim Health and Safety certified. We are members of the Civil Engineering Contractors Association. We are a Section 278 approved contractor for Kent County Council. We also have ISO 14001(Environmental certification), ISO 9001 (Quality Assurance).