Ovenden Allworks surfacing division undertook the new kilometre of footpaths around the Gibraltar Barracks in Minley, Surrey.

These works included the shaping of the sub-base, laying of the kerbs and the laying of the blacktop.

Also, the construction of new 4 bellmouths and a set of steps to increase accessibility in the barracks. These works were completed while working along highways in constant use, therefore traffic management was a priority.

These works required close cooperation between ourselves and the main contractor, Limen Construction as there are strict rules to be adhered to when working inside a Ministry of Defence base.